The short answer
- Size decides most of the priceA studio annexe starts around £52,000. A standard one-bedroom annexe, the size most families choose, is £70,000 to £115,000.
- Converting an existing building is far cheaper than a new oneA garage or outbuilding conversion can cost as little as £7,500 to £20,000, though it usually will not be self-contained.
- VAT adds 20% to almost every annexeBecause most granny annexes cannot be sold or let separately from the house, they fail HMRC's test for the zero rate that applies to a fully independent new home.
- Budget £6,048 to £28,548 beyond the build itselfProfessional fees, a planning application, groundwork and utility connections are usually on top of the headline build price.
Figures are UK build-cost guides for 2026, not a quote for any specific project. Get quotes from at least three local builders before you commit to a budget.
What it costs
What a granny annexe costs to build, by size
The single biggest thing that decides the price is how big the annexe is and how much it needs to do. A shower room and a bed cost far less than a full kitchen, bathroom and separate bedroom.
A studio or one-room annexe
around 20 to 25 square metres: A bedroom, a shower room and a small kitchenette. Usually a kit-built structure or a garage conversion.
£52,000 to £65,000
A standard one-bedroom annexe
35 to 50 square metres: A separate bedroom, living space, kitchen and bathroom. The size most families building for a parent choose.
£70,000 to £115,000
A larger two-bedroom annexe
75 to 80 square metres: Room for a couple, or a bedroom plus a study or a spare room for a carer to stay over.
£155,000 to £190,000
Figures are UK build-cost guides for 2026 and do not include the professional fees, planning application, groundwork or utility connections that usually sit on top of the build price. Get quotes from three local builders before you budget against any figure here.
For most families, the annexe that makes sense for a parent is the middle band: £70,000 to £115,000 for a self-contained one-bedroom annexe with its own kitchen and bathroom. That price is for the build itself, structure, groundwork, electrics, plumbing, heating, the kitchen and bathroom fitted, and decorating throughout. The professional fees, planning application, site preparation and utility connections covered below usually sit on top of it, so treat the figures above as the building cost rather than the whole project cost.
Type of construction
Why converting an existing building costs so much less
The same size of annexe can cost very different amounts depending on whether it starts from an existing structure or from bare ground, and whether it ends up self-contained.
| Typical cost | Self-contained? | Planning permission | |
|---|---|---|---|
| Garage or outbuilding conversion | £7,500 to £20,000 | Often not, unless a kitchen and bathroom are added | Often not needed |
| Timber-frame kit-built annexe | £52,000 to £155,000+ | Yes, usually | Almost always needed |
| Traditional brick and block, built on site | £80,000 to £190,000+ | Yes | Almost always needed |
Garage or outbuilding conversion
- Typical cost
- £7,500 to £20,000
- Self-contained?
- Often not, unless a kitchen and bathroom are added
- Planning permission
- Often not needed
Timber-frame kit-built annexe
- Typical cost
- £52,000 to £155,000+
- Self-contained?
- Yes, usually
- Planning permission
- Almost always needed
Traditional brick and block, built on site
- Typical cost
- £80,000 to £190,000+
- Self-contained?
- Yes
- Planning permission
- Almost always needed
Whether an annexe needs planning permission depends on its size and how self-contained it is, not on which of these three routes you choose.
A garage or outbuilding conversion is the cheapest route because the walls, roof and foundations already exist, and the work is mostly internal. It is usually the right choice when a parent needs somewhere close by rather than a fully separate home, but sharing a kitchen or bathroom with the main house is not the same as having their own front door. A timber-frame kit, built off-site in sections and assembled on your foundations, sits in the middle: faster to put up than a brick-and-block build and usually a little cheaper for the same size. A traditional brick-and-block annexe, built on site from scratch, costs the most but matches the main house in look and lifespan, which matters if resale value is part of the decision.
Extra costs
What to budget for on top of the build
The build price is not the whole bill. Four things are usually added to it, and none of them are optional if the annexe needs a formal planning application.
Professional fees
£2,000 to £8,000
Planning application
£548
Groundwork and site access
£2,000 to £15,000
Utility connections
£1,500 to £5,000
Whether a formal planning application is needed, and so whether the £548 fee applies, comes down to the same question that decides VAT: is the annexe self-contained. Do you need planning permission for a granny annexe sets out the full rule, what each type of annexe needs, and what happens if an application is refused.
What changes the price
What pushes the price up, and what brings it down
Two annexes of the same size, built to the same standard, can still come out thousands of pounds apart because of the site they are built on.
Tends to bring the cost down
- Converting an existing garage or outbuilding rather than starting from bare ground
- A simple rectangular footprint, rather than an unusual shape
- A kit-built or modular annexe rather than a bespoke brick-and-block build
- A site close to the house, with easy access for a delivery lorry or a concrete mixer
Tends to push it up
- Sloped or wet ground that needs levelling or draining before anything else can start
- Trees that need surveying or removing, or a boundary close enough to need a party wall agreement
- A back garden a lorry cannot reach, so materials have to be carried in by hand
- A high-end kitchen, bathroom and finish throughout, rather than a standard specification
Get quotes from at least three local builders before you settle on a figure. A site visit will catch the groundwork and access costs that a phone estimate cannot, and a builder who has worked on annexes in your area will have a realistic sense of what your council usually asks for.
Getting it built
Turning a budget into a signed contract
Once you have a figure to plan around, four things settle whether the build stays close to it or runs away from you.
- 1
Add a contingency of 10% to 15% before you agree a figure
Before you commitGround conditions are not fully known until groundwork starts, and unexpected drains, buried services or unstable ground are common rather than rare on a garden site. Treat the contingency as money held back, not spent on upgrades, until the build is under way. - 2
Ask each builder for a fixed price with staged payments
When you compare quotesPay against work completed, in stages agreed before the build starts, rather than a large deposit upfront. A written, fixed-price contract protects you if material prices rise partway through the build, in a way a verbal estimate does not. - 3
Building regulations approval is separate from planning permission
Almost always neededIt covers structural safety, fire safety, drainage, electrics and insulation, and is checked by building control as the work goes up rather than by the planning department. Because an annexe has somewhere to sleep, it falls outside the size exemptions that let a garden shed or office skip this step, even on the routes where planning permission itself is not required. - 4
Decide how you will pay for it before you sign a contract
Before you signSavings, a further advance on the mortgage, equity release, or help from family are the routes most families use. A mortgage adviser, or for equity release a member of the Equity Release Council, can set out what each route costs over time before you commit to a builder.
Add the eight to thirteen weeks a planning decision usually takes to the time on site, and the two routes end up with quite different totals. A kit-built or timber-frame annexe, on site for eight to sixteen weeks once permission and building regulations are agreed, is usually four to seven months from a submitted application to moving day. A brick-and-block build, on site for four to six months, is usually six to nine months from application to moving day. Either figure is worth building into any plan for a parent who needs somewhere to live sooner than that.
Weighing it up
Building an annexe against the alternatives
A build costing tens of thousands of pounds is worth setting against what else that money, and that time, could do for your parent.
None of these rule out building an annexe, and for many families it remains the right answer: a parent close by, in their own space, with the family able to see them every day. It is worth working through the four points above before you commit, because the annexe that makes financial sense is not always the annexe you pictured at the start.
Questions
Questions families ask about the cost of building a granny annexe
A self-contained granny annexe typically costs £52,000 to £190,000 to build, depending mostly on size. A small studio annexe starts around £52,000. A standard one-bedroom annexe, the size most families building for a parent choose, costs £70,000 to £115,000. A larger two-bedroom annexe can reach £155,000 or more. These figures are for the build itself and do not include professional fees, planning costs or utility connections.
Usually, yes. A garage or outbuilding conversion can cost as little as £7,500 to £20,000, because the walls, roof and foundations already exist. The trade-off is that a simple conversion often shares a kitchen or bathroom with the main house, rather than giving your parent a fully separate home with their own front door.
In almost all cases, yes, at the standard 20% rate. The zero rate for a new home only applies to a building that could be sold or let separately, with its own access, and most granny annexes are built for a family member with no intention of ever selling them apart from the house. Ask a VAT specialist to confirm the position for your project before signing a building contract.
Budget for professional fees of £2,000 to £8,000 (architect, structural engineer and building control), a £548 planning application fee if one is needed, £2,000 to £15,000 for groundwork and site access, and £1,500 to £5,000 to connect mains electricity, water and drainage. Together these can add £6,048 to £28,548 to the headline build price.
It depends on the property market where you are looking as much as on build costs. Buying skips the build and the wait, but stamp duty on a house with an annexe costs more than it used to since a tax relief was withdrawn in 2024. How to find a house with a granny annexe for sale covers searching for one, and do granny annexes add value covers the stamp duty change.
Often, though not always. A well-finished, self-contained annexe is estimated to add around 20% to 30% to what a house is worth, which on many properties is more than the build cost. A poorly finished annexe, or one that takes up most of the garden, can add much less. Do granny annexes add value works through the figures.
No. Planning permission decides whether the annexe can be built at all, and on what terms. Building regulations approval is a separate process, checked by building control rather than the planning department, and covers the safety of the structure itself: fire safety, drainage, electrics, insulation and how it is built. Because a granny annexe has somewhere to sleep, it needs building regulations approval even on the routes where planning permission is not required. Do you need planning permission for a granny annexe covers the planning side in full.
For some families, at least in the short term. Live-in care on PrimeCarers costs from £1,050 to £1,400 a week with our fee included, which is a fraction of a £70,000 build in the first year, though it does not add anything to the value of the house. Many families use care in the parent's current home as a first step, and look at an annexe later if the arrangement needs to become more permanent. How live-in care works covers what is involved.